香蕉视频直播

Skip to content

'Random minor delays' expected near Sicamous as Bruhn Bridge work starts

Site preparation along Highway 1 starting Monday, Oct. 28
241024-saa-sic-bruhn-bridge-start
Site preparation for the Bruhn Bridge replacement is set to start on Monday, Oct. 28 with minor delays expected.

The long awaited Bruhn Bridge replacement project in Sicamous is finally breaking ground with minor traffic delays expected to start next week.

DriveBC announced that road construction work will begin on Monday, Oct. 28, for a two-kilometre stretch of Highway 1 between Old Sicamous Road and Solsqua-Sicamous Road. 

"Expect random minor delays for site preparation and sign installation," the post reads, reminding drivers to watch for traffic control and equipment. 

A media release from the District of Sicamous earlier this month said they had been advised that full closures will not begin in October, and that the project management team and contractor Aecon have submitted a construction schedule and traffic management plan to the Ministry of Transportation and Infrastructure for approval. 

Updates on the work and road closures can be found on both the district website at and . 



About the Author: Heather Black

Read more



(or

香蕉视频直播

) document.head.appendChild(flippScript); window.flippxp = window.flippxp || {run: []}; window.flippxp.run.push(function() { window.flippxp.registerSlot("#flipp-ux-slot-ssdaw212", "Black Press Media Standard", 1281409, [312035]); }); }