香蕉视频直播

Skip to content

Ferry servicing Nanaimo-Tsawwassen anticipated to be out until October

BC Ferries updates travellers about Coastal Renaissance香蕉视频直播檚 engine breakdown
33682047_web1_230830-NBU-Coastal-Renaissance-Aug-22-Update_1
BC Ferries has probed failure of the engine on the Coastal Renaissance ferry servicing Nanaimo and Tsawwassen. (Photo courtesy BC Ferries)

A ferry servicing Nanaimo and Tsawwassen is anticipated to be out of commission until at least after Thanksgiving, says BC Ferries.

Engine problems led to the Coastal Renaissance being taken out of service on Aug. 17. At a press conference Tuesday, Aug. 22, Stephen Jones, BC Ferries executive director of engineering, said while the drive motor has been inspected, the full scope of repair can only be determined after a rotor is removed.

A plan is expected to be in place by Sept. 1, he said. BC Ferries expects to be able to do a rotor lift between Sept. 7-10, then an inspection between Sept. 11-15. After that, the company will need to order materials, rewind the stationary part of the rotary system and then put the motor back together.

Jones said based on information from a technician, rewinding takes approximately five weeks and it would be safe to say that it 香蕉视频直播渨ould be unlikely to see this vessel back before mid October.香蕉视频直播

The Queen of Coquitlam, servicing the Horseshoe Bay-Langdale route, has been reassigned to handle Coastal Renaissance traffic two days a week, and Karen Tindall, BC Ferries香蕉视频直播 director of customer care, said that has been helpful. Customers should plan in advance with the impending Labour Day long weekend, she said.

香蕉视频直播淚f you don香蕉视频直播檛 have a booking, there is very limited space left after we香蕉视频直播檝e done these cancellations on the route香蕉视频直播ο憬妒悠抵辈 said Tindall. 香蕉视频直播淲e香蕉视频直播檙e just in the process of identifying refit timelines and other pieces of this puzzle so that we can inform customers as soon as we know.香蕉视频直播

RELATED:

As for Thanksgiving long weekend sailings, Nicolas Jimenez, BC Ferries president and CEO, said plans are being developed.

香蕉视频直播淵ou have to recognize fewer people travel in the fall香蕉视频直播ο憬妒悠抵辈 he noted. 香蕉视频直播淭he October Thanksgiving weekend, we begin our refit schedules. This is when all of our vessels are scheduled to go into their annual maintenance program cycle, so we香蕉视频直播檙e looking at that plan, that schedule, which vessels, which routes, in order to address the Renaissance not being available. We香蕉视频直播檒l have more to say on that as that plan unfolds.香蕉视频直播

RELATED:



karl.yu@nanaimobulletin.com

Follow Karl on and subscribe to our for the latest news.



Karl Yu

About the Author: Karl Yu

I joined Black Press in 2010 and cover education, court and RDN. I am a Ma Murray and CCNA award winner.
Read more



(or

香蕉视频直播

) document.head.appendChild(flippScript); window.flippxp = window.flippxp || {run: []}; window.flippxp.run.push(function() { window.flippxp.registerSlot("#flipp-ux-slot-ssdaw212", "Black Press Media Standard", 1281409, [312035]); }); }