The PNE香蕉视频直播檚 Summer Night Concerts will move into the Pacific Coliseum while the new 10,000-capacity outdoor amphitheatre is constructed on the fairgrounds in East Vancouver.
The 2024 concerts kick off Aug. 17 with Burton Cummings Band/Colin James and end Sept. 2 with an 香蕉视频直播淚 Love the 90香蕉视频直播檚香蕉视频直播 lineup featuring Vanilla Ice, Rob Base and All-4-One, on the arena香蕉视频直播檚 Chevrolet Stage.
Announced Wednesday (April 10), the PNE香蕉视频直播檚 diverse pop, rock, country and R&B concerts will also feature Amanda Marshall with Serena Ryder (Aug. 18), Bachman-Turner Overdrive (Aug. 20), Blondie (Aug. 21), John Fogerty (Aug. 22), Brad Paisley (Aug. 23), Charlotte Cardin (Aug. 25), The Commodores with The Pointer Sisters (Aug. 27), Flo Rida (Aug. 28), Blue Rodeo (Aug. 29), Ludacris (Aug. 30), Punjabi Virsa Night (Aug. 31) and Barenaked Ladies (Sept. 1).
Fair admission is included in the cost of a ticket, which are sold for $40 and up starting at 10 a.m. Friday, April 12, on . A 香蕉视频直播減re-sale香蕉视频直播 period starts at 10 a.m. Thursday, April 11.
For the PNE concerts this summer, the Coliseum will become a concert bowl for between 5,500 and 9,500 fans, with floor seats (reserved seating) and no general seating/standing in the arena.
THE 2024 SUMMER NIGHT CONCERTS LINEUP IS HERE! 馃専馃幎
香蕉视频直播 PNE Fair / Playland (@PNE_Playland)
Pre-sale starts tomorrow (April 11) at 10:00AM
Tickets go on-sale Friday (April 12) at 10:00AM
Which show are you looking forward to most?! Check out the full lineup below馃ぉ
The PNE香蕉视频直播檚 full entertainment program will be announced in May on and social media channels.
Due open in 2026, is designed by local company Revery Architecture. Revealed a year ago, the design includes a parachute-style open-air timber roof that touches down onto the ground at three points. It offers three viewing areas, with the two closest to the stage seated and the one furthest back an open grassy area.
PNE officials say the new amphitheatre will host at least 75 performances and welcome more than 340,000 people a year.
Also at the PNE, themes of 香蕉视频直播渨ild energy香蕉视频直播 and 香蕉视频直播渆lectrifying speed香蕉视频直播 emerged in a contest to name . The $16-million ride, now under construction, is due open this year on land previously occupied by the beloved Corkscrew coaster, which closed in 2019. The Thundervolt is anticipated to open in July, with an exact opening date of the ride to be set in mid-June.
The ride-construction contract was estimated at $9 million in November 2022 when considered 香蕉视频直播渢he largest single attraction investment made by Playland.香蕉视频直播